South Bend WWTP

Replacement of digester cover along with new external draft tube mixers with water jackets. Provide a new boiler, gas cleaning system, and associated sludge pump Existing Digester Control Building will be rebuilt for a new boiler room, electrical room and piping room. A new exterior façade will cover the renovated Digester Control Building as well as the refurbished Digester Tank. Work began on August 21st and will be done in January 2015.

The project includes:

  • Replace the 110’ Diameter digester cover.
  • New external 42” Diameter draft tube mixers with water jackets.
  • New boiler
  • New gas cleaning system
  • New sludge transfer pump
  • Renovate existing Digester No. 2 Control Building for a new boiler room, electrical room and piping room
  • New EIFS exterior façade for Digester No. 2 and Digester No. 2 Control Building