coleman rd. bridge

About

This Project

This MDOT Bridge project was a full demolition and rebuild. The Coleman Road Bridge over the Chippewa River required a full shutdown for the duration of the project with detours available. Below is a complete list of all elements that were associated with the scope of the project.

Previous slide
Next slide

Check out our progress

Play Video

Client

MDOT

Cost

$4.4 Million

Our role

General Contractor

Completion

November 2021